CLIENT

PHARMASCIENCE CANADA

PROJECT

Town of Mount Royal plant

 

Phoenix II, lots 2, 3 and 4

Rooms preparation and fit-out for the installation of new equipment to increase the capacity for coating granules up to 300%. Pharmascience proceeded with a $10 million investment to pursue the Phoenix II project for the construction of suitable GMP space in which to operate the HS and FBD units. In order to optimize construction cost efficiency, a block of 10 rooms has been built.

One room to house the HS/FBD suite

One room to house a Korsch FT 400 with bilayer and trilayer capability

One multifunctional room with capacity to house a future encapsulator

Three multifunctional rooms for blending

One turret set-up room

One cleaning room dedicated for tablet press and/or encapsulation changeovers

Two clean equipment storage rooms

 

Optipack, phase 1

Construction of two production lines, including the filling and washing rooms. Our mandate also included the supply and installation of the following equipment: air compressor and dryer, HVAC units, boilers, chillers and electrical equipment.

MANDATE

Construction management

 

LOCATION

Montreal, Quebec

 

SECTOR

Pharmaceutical and biotechnology

pharma-science-252x59
Category
Pharmaceutical