CLIENT
PHARMASCIENCE CANADA
PROJECT
Town of Mount Royal plant
Phoenix II, lots 2, 3 and 4
Rooms preparation and fit-out for the installation of new equipment to increase the capacity for coating granules up to 300%. Pharmascience proceeded with a $10 million investment to pursue the Phoenix II project for the construction of suitable GMP space in which to operate the HS and FBD units. In order to optimize construction cost efficiency, a block of 10 rooms has been built.
One room to house the HS/FBD suite
One room to house a Korsch FT 400 with bilayer and trilayer capability
One multifunctional room with capacity to house a future encapsulator
Three multifunctional rooms for blending
One turret set-up room
One cleaning room dedicated for tablet press and/or encapsulation changeovers
Two clean equipment storage rooms
Optipack, phase 1
Construction of two production lines, including the filling and washing rooms. Our mandate also included the supply and installation of the following equipment: air compressor and dryer, HVAC units, boilers, chillers and electrical equipment.