CLIENT
SONOMA NUTRACEUTICALS
PROJECT
GMP Manufacturing Upgrades – Phases 1 and 2
Phase 1
Construction of new GMP Manufacturing inside the existing warehouse area. The scope includes the following areas with all supporting services:
Four (4) tablet press rooms
Control office
One packaging line (primary and secondary)
Wash-up area and clean equipment storage
Material air-lock
Personnel air-lock
Electrical room
Tool room
Phase 2
Procurement of long lead delivery equipments: AHUs (rooftop), return fan units, equipment required for coater, pharma wall, ceiling system, doors, frames and hardware. Installation of an existing coating equipment recuperated from another facility.